

An installation job for Creative Technology: we installed and set up the LED and the holographic projection, calibrated the stage, and ran content live on the show’s media servers, with our engineers on site through the show.


1
Prepare
planned the LED workflow and calibrated the stage
2
Set up
installed the LED and the holographic projection
3
Operate
ran content live on the show’s media servers
4
Show
engineers on site through the show
Next case
2025 · Sport wipe
Open the case →